måndag 27 oktober 2014

All service openings capable of being re-opened for future inspection or

 All service openings capable of being re-opened for future inspection or
remediation shall be clearly marked and shall have their location reported to the
owner in project report documents.
(G) Ceiling Tile
The contractor may remove and reinstall ceiling sections to gain access to HVAC systems during
the cleaning process.
(H) Air Distribution Devices (registers, grilles & diffusers)
The contractor shall clean all air distribution devices.
(I) Air Handling Units, Blowers and Exhaust Fans
The contractor shall insure that supply, return, and exhaust fans and blowers are thoroughly
cleaned. Areas to be cleaned include blowers, fan housings, plenums (except ceiling supply and
return plenums), scrolls, blades, or vanes, shafts, baffles, dampers and drive assemblies. All
visible surface conta

Inga kommentarer:

Skicka en kommentar